Friday, May 29, 2009

Mission visit from U.S. to Pena Blanca

The black eye is a result of neglect.
Our mission team nurses find a new friend to help.

This little girl has extreme burns on left side of body, her foot is gone.


Things should be better now, but i notice it was hard for her to smile, she was burned at the age of three, due to a fire caused by a candle.



Our little friend has blonde hair, (strong European influence) but she is 100% Honduran.
from left to right: Rosie, Carolyn, Diana bottom: Ruth, and our new little friend.
Photo by chris rivera


Earthquake Honduras





Loque is overseeing the building of the Kid'z Church Visitor does our Sunday Worship.
Proposed Cafe site to do community outreach.
Church benches of block and "canaletta"

It's been a while, but there is news !

Monday, May 4, 2009

Dear Friends...

We are trying to get a new camera as our old one finally broke, we do alot of blog updates with pics and comments. ALL IS WELL, we anticipate new neat things in ministry; work crews to help finish the church, medical teams, administrating at the bilingual school, and last but not least working with Potter's Field Ministry in our attempts of working with Central America and her "needy children". Please pray that needs are met, and please offer prayer in thanks giving for the things that have already been done and promised!

Sunday, April 19, 2009

We did get the extra land parcel which will help greatly in parking and the placing of our septic system, thank you Don Gaspar, But more over thank you, LORD!

Tuesday, March 24, 2009

CHURCH CONSTRUCTION PRAYER LIST 2009

PRAYER LIST FOR THE SUMMER OF 2009



There have been requests by visitors, asking me to POST a list of projects that need to be completed in regards to the new church building, well here they are :


1) We need the top part of the pitched roof capped on the church. We will need a high powered metal screw driver (4" screws self tapping) for tin roof. Power will be pulled from nearby power line.


2) We need to do serious completion of the Kidz Church, we need to complete all the cinder block walls interior and exterior. Cement mixed by hand, with fine sand and carried to block handlers by wheelbarrow. We can enlist the help of local men.


3) We need to put a roof on the Kidz Church the tin is already purchased (need buy the screws and metal support beams).


4) We will then need to white plaster all the interior walls (paint is just as expensive).


5) We need electric wiring and light fixture set up. Wires are put in pre-set tubing in the walls.


6) We will need a septic trench dug and pvc set for toilets and sinks.(bathrooms and Cafe)


7) A final project will include the pouring of cement for the floor of both Church and Kidz Church. We plan to use a decorative concrete floor stain and cut scores into the slab resembling tile work.


8) We will need interior furniture, pews, pulpit, and desks.


9) Then we can focus on the Cafe which we will use as a ministry outreach and incoming team fellowship.


10) A final landscape finish will be applied with proper water runoff and design. Local flowers, shrubs, coffee plants, banana trees and the like to be planted.