PRAYER LIST FOR THE SUMMER OF 2009
There have been requests by visitors, asking me to POST a list of projects that need to be completed in regards to the new church building, well here they are :
1) We need the top part of the pitched roof capped on the church. We will need a high powered metal screw driver (4" screws self tapping) for tin roof. Power will be pulled from nearby power line.
2) We need to do serious completion of the Kidz Church, we need to complete all the cinder block walls interior and exterior. Cement mixed by hand, with fine sand and carried to block handlers by wheelbarrow. We can enlist the help of local men.
3) We need to put a roof on the Kidz Church the tin is already purchased (need buy the screws and metal support beams).
4) We will then need to white plaster all the interior walls (paint is just as expensive).
5) We need electric wiring and light fixture set up. Wires are put in pre-set tubing in the walls.
6) We will need a septic trench dug and pvc set for toilets and sinks.(bathrooms and Cafe)
7) A final project will include the pouring of cement for the floor of both Church and Kidz Church. We plan to use a decorative concrete floor stain and cut scores into the slab resembling tile work.
8) We will need interior furniture, pews, pulpit, and desks.
9) Then we can focus on the Cafe which we will use as a ministry outreach and incoming team fellowship.
10) A final landscape finish will be applied with proper water runoff and design. Local flowers, shrubs, coffee plants, banana trees and the like to be planted.